給開山留言 | 網站地圖
空壓機長期停放注意事項
2018-11-23 10:17:34      點擊:
空壓機的(de)停用在各個單位(wèi)都常有發(fā)生。那麼在初次開(kāi)機前(qián)空壓機(jī)停放時間超過三個月或空(kōng)壓(yā)機停用時(shí)間超過三個月,再次開機前需要(yào)采取有(yǒu)效(xiào)措施,bi須(xū)先請專業空壓機人員對機器(qì)進行保養檢測,制(zhì)定安全措施,避免開機後發生不良(liáng)狀況。

The shutdown of air compressors often occurs in various units. Then, before the first start-up, the air compressor parking time is more than three months or the air compressor parking time is more than three months. Before the second start-up, effective measures need to be taken. The Bi must first ask professional air compressor personnel to carry out maintenance and inspection of the machine, and formulate safety measures to avoid adverse conditions after the start-up.



1、先(xiān)檢查電路狀态,是否(fǒu)正常供(gòng)電,電壓是否穩定;測量電動機絕(jué)緣電阻,數值大于1MΩ。

1. Check the state of the circuit first, whether the power supply is normal, whether the voltage is stable; Measure the insulation resistance of the motor, the value is greater than 1M.



2、檢查空壓機配件上是否含有積水,灰塵,及時清理。

2. Check whether there is water and dust on the spare parts of air compressor, and clean them up in time.



3、對進氣口,出氣口(kǒu)全面(miàn)檢測,防止發生堵塞現象

3. Overall inspection of intake and outlet to prevent blockage



4、在上述都(dōu)已經(jīng)完成的情況可以接(jiē)通電(diàn)源,查看電腦控制器是否(fǒu)正常運行(háng)

4. If all the above have been completed, the power supply can be connected to check whether the computer controller is working properly.



5、更換三濾和潤滑油(yóu)。因為在長(zhǎng)期不(bú)用的情況下,三濾,油可能發生老化(huà)現象,從而(ér)造成空壓(yā)機開機運行時間(jiān)不長即結膠積碳或堵塞,油路不暢使空壓機主機或其他零部件損壞。

5. Replace three filters and lubricants. Because in the case of long-term non-use, three filters may cause oil aging phenomenon, which causes the air compressor start-up time is not long, that is, cementing carbon deposit or blockage, oil circuit is not smooth, so that air compressor main engine or other parts are damaged.



6、專業人員試機,電(diàn)路改造後人工控制(zhì)加載卸載,先空載運行10分鐘以(yǐ)上,檢測各項指(zhǐ)标和震動、噪音等正常,再進行加(jiā)載,查看各部(bù)件運行正常即(jí)可。

6. Professional personnel test machine, after circuit modification, manual control loading and unloading, first no-load operation for more than 10 minutes, detection of various indicators and vibration, noise and other normal, then load, check the normal operation of the components.
給開山(shān)留言 | 網站地(dì)圖
Sitemap